Day 1: Demo

Al came through with some cameraphone photos of the Day 1 work, which consisted entirely of demo. I don't know why I'm surprised that they managed to strip most of the bathroom (save for the tub) to the studs in such a short time, but I am.

032607_21041.jpg
The view from the doorway. The black bit on the floor is where the toilet goes; it'll be coming back, because it's relatively new.

032607_21051.jpg
The debris from the vanity and wall removal, stacked in the tub.

032607_21061.jpg
Where the too-low vanity once stood. Although there are hookups for two sinks, we only had one (on the left); the new design will also incorporate only one sink, in the center.

Posted by Lori in master bath remodel at 7:15 AM on March 27, 2007

Comments (1)

It's quite amazing how quickly they pull down and how slowly they put up.

Comments

It's quite amazing how quickly they pull down and how slowly they put up.

Posted by: byjane at March 27, 2007 7:33 PM

Comments are now closed.