Day 1: Demo

Al came through with some cameraphone photos of the Day 1 work, which consisted entirely of demo. I don't know why I'm surprised that they managed to strip most of the bathroom (save for the tub) to the studs in such a short time, but I am.

032607_21041.jpg
The view from the doorway. The black bit on the floor is where the toilet goes; it'll be coming back, because it's relatively new.

032607_21051.jpg
The debris from the vanity and wall removal, stacked in the tub.

032607_21061.jpg
Where the too-low vanity once stood. Although there are hookups for two sinks, we only had one (on the left); the new design will also incorporate only one sink, in the center.

Posted by Lori in master bath remodel at 7:15 AM on March 27, 2007

Comments

It's quite amazing how quickly they pull down and how slowly they put up.

Posted by: byjane at March 27, 2007 7:33 PM

Comments are now closed.